Amigurumi Free Pattern

Crochet Knitting Shoes Free Pattern

Hello amigurumi lovers and beautiful visitors, I wanted to share the free amigurumi patterns for you here. In my article I will share 1 pattern and how to make it for you. At the end of my article, I will share amigurumi patterns that can generate ideas for you.


You will need:

  • knitting hook 3.5 mm;
  • dual-connection yarn twisted from 8 threads – Drops Cotton Light ( Palette of used colors: green, yellow, brown and purple );
  • a Lenin needle;
  • two buttons.

Dimensions:
Scheme for sizes for 0-6 months. For 6-12 months, see in parentheses.

Succession Length:
For 0-6 months – 9cm
For 6-12 months – 10cm

Abbreviations:
p – loop
VP – air loop
SS – connection column
SBN — pillar without cape
PSN – half-column with nakid
SSN – cape with cape
Following. – next ( loop )
*…* — repeat the indicated number of times from the asterisk to the asterisk
SBN decrease – tie 2 columns together as 1 SBN
PSN decrease — tie 2 columns together as 1 PSN
SSN decrease — tie 2 columns together as 1 CCH

Knitting density:
1 inch = 4 rows of 5 PSN

Reduce one column without a cape ( 2 SBN together ).
Insert the hook into the next loop, pull the thread. There are 2 loops on the hook.
Insert the hook into the next loop again and pull the thread
There are now three loops on the hook. Grab the thread and stretch it through three loops on the hook.

Podoshva
We knit on the spiral.
1 row – Take a brown yarn, type 11 VP ( 13 VP ). 2 PSN in the second hook loop. Next 8 ( 10 ) p 1 PSN. 6 PSN at the last. VP. ( Note: now we begin to knit on the other side of the typed chain ). Next 8 ( 10 ) p 1 PSN. 2 PSN in the last p. Total number of loops 26 ( 30 ).

2 row – in the first 2 p to 2 PNS. Next 8 ( 10 ) p 1 PSN, next. 6 p on 2 CCN, 1 PSN per next. 8 ( 10 ) p, 2 PSN per next. 2 loops. Total number of loops 36 ( 40 ).

3 row – in the first 2 p to 1 PNS, next 3 p to 2 PSN, next. 5 ( 7 ) p to 1 PSN, next. 3 p to 1 CCH, 2 STS in one p, 1 STS in the next. n * — repeat 6 times. Following. 3 p to 1 CCN. Following. 5 ( 7 ) p 1 PSN. Following. 2 p to 2 PNS, 1 PSN and 1 SBN in the last p. Complete the row using the SS. Total number of loops 48 ( 52 ). Trim the thread and refuel the remaining tail.

Dumb
We knit on the spiral.
1 row — start knitting from the middle of the ass, fixing the green thread. 1 VP, 1 SBN in the same p, but only behind the back wall. ( Note: continue knitting on the back wall of the loop ). Next 47 ( 51 ) p 1 SBN.

2-3 row — 1 SBN in each p in a circle. ( Note: if you knit for a size of 6-12 months, then tie another 1 additional row ).

4 row – next 14 ( 16 ) p 1 SBN, * 1 decrease SBN, 1 SBN next. p * — repeat 7 times. Next 13 ( 15 ) p 1 SBN. Total number of loops 41 ( 45 ).

5 row – in the first p 1 SBN, 1 decrease in SBN, next. 10 ( 12 ) p 1 SBN, * 1 decrease in SBN, 1 SBN next. p * — repeat 5 times. Following. 10 ( 12 ) p 1 SBN, 1 decrease of SBN, next. p 1 SBN. Total number of loops 34 ( 38 ).

6 row – next 12 ( 14 ) p 1 SBN, 2 PSN reductions, 2 SSN decreases, 2 PSN decreases. Next 10 ( 12 ) p 1 SBN. Total number of loops 28 ( 32 ).

7 row – 1 SBN in each p in a circle. Complete the row using the SS. Trim the thread and refuel the remaining tail.

Remeshki
For a strap on the right tweezers, attach a green thread to the 10th p 7th row of the tibia, and for a strap on the left tweezers, attach a blue thread to the 20th p 7th row of the tibia.
Dial 12 VP, 1 PSN in the sixth p from the hook, next. 6 p to 1 PSN. Complete the row using the SS. Trim the thread and refuel the remaining tail.
Sew one button on the opposite side of each kick.

Butterfly
Everyone is happy to complete with the help of the SS.
1 row – Take a yarn of yellow color, type 2 VP, 8 SBN in the second p from the hook. Total number of loops 8.

2 row – 1 VP, 2 SBN in each p in a circle. Total number of loops 16.

3 row – Attach the purple thread to the 1st p 2nd row of the connected circle. 2 VP and 5 STS in the same p. *Skip 1 p, next n 1 SS, skip 1 p, next. p 5 PSN * — repeat 2 times. Skip 1 p, next n 1 SS, skip 1 p, next. n 5 CCN, 2 VP and SS in the same p. Trim the thread and refuel the remaining tail.
Take the lazing needle and yarn purple, stitch the middle ( tile ) butterflies. Then tie together with the node the two remaining thread tips ( you will get the antennae ) and cut them, leaving the required length of the antennae.
Sew one butterfly on the front of each knitted booze.

Feel free to tag me (@freeamigurumii) in your photos on Instagram or Facebook if you’d like!

All Finished.

You may also like...